Nashville's Best New Homes! 
Well, naturally there are a lot of variables, but the most important thing to keep in mind is no matter how long it takes, do not rush it. Sure, if you were a Ukrainian pioneer trying to build a hut out of sticks and straw in a valiant attempt to fend off the cruel unforgiving winter of the prairies, you’d probably want to get it done as soon as possible. However, the reality is that there are many variables that have to be considered.
Stick Built Construction: Our signature method of quality construction.
 The size of the house, sub-contractors (especially if waiting on a specialty craftsman), and for sure, weather conditions will all have an effect on your home building timeline. Generally it takes six to twelve months, based on the home complexity and finish detail. Remember, the more planning you do in the early stages of the process, and the fewer changes you make during construction, will save time. The model presented here is a guide. It should give you a good idea of what to expect.
 Stake out home location
 State soil map inspection
 Secure the necessary municipal and state building permits
 Begin excavating the site
 Pour the footers
 Lay block walls
 Insulate & waterproof block walls
 Termite treatment
 Frame walls along with roof, ceilings, door opening and windows
 Install more sub-floors
 Install exterior wall and roof sheathing
 Rough-in electrical and plumbing
 Install sprinkler system
 Install flashing and shingles
 Apply windows and exterior doors
 Install exterior trim
 Apply exterior wall finish
 Install interior, including cabinets and countertops
 Install bath and toilet fixtures
 Custom Paint & Trim out
 Pour concrete drive & walks
 Install final flooring
 Install appliances
 Touch everything up for building inspectors
 Finish grade & landscape
 Builder / Buyer walkthrough
 Mortgage closing
 Move in and relax!
|