Well, naturally there are a lot of variables, but the most important thing to keep in mind is no matter how long it takes, do not rush it. Sure, if you were a Ukrainian pioneer trying to build a hut out of sticks and straw in a valiant attempt to fend off the cruel unforgiving winter of the prairies, you’d probably want to get it done as soon as possible. However, the reality is that there are many variables that have to be considered.
 Stick Built Construction: Our signature method of quality construction.
Bitmap ImageThe size of the house, sub-contractors (especially if waiting on a specialty craftsman), and for sure, weather conditions will all have an effect on your home building timeline. Generally it takes six to twelve months, based on the home complexity and finish detail. Remember, the more planning you do in the early stages of the process, and the fewer changes you make during construction, will save time. The model presented here is a guide. It should give you a good idea of what to expect.

Stake out home location
State soil map inspection
Secure the necessary municipal and state building permits
Begin excavating the site
Pour the footers
Lay block walls
Insulate & waterproof block walls
Termite treatment
Frame walls along with roof, ceilings, door opening and windows
Install more sub-floors
Install exterior wall and roof sheathing
Rough-in electrical and plumbing
Install sprinkler system
Install flashing and shingles
Apply windows and exterior doors
Install exterior trim
Apply exterior wall finish
Install interior, including cabinets and countertops
Install bath and toilet fixtures
Custom Paint & Trim out
Pour concrete drive & walks
Install final flooring
Install appliances
Touch everything up for building inspectors
Finish grade & landscape
Builder / Buyer walkthrough
Mortgage closing
Move in and relax!